Laserfiche WebLink
Control Number: <br />505.02.01.001 <br />Version: <br />2.1 <br />Title: <br />Inspection of Facilities and Facility <br />Logs <br />Page Number: <br />13 of 13 <br /> <br />• Vocational work project daily logs and information reports (see section 7) <br />The shift commander on the second shift will begin the daily packet process and pass the <br />daily information packet to the third shift, shift commander. The third shift commander will <br />collect the third shift information, add it to the daily information packet, and pass it to the first <br />shift, shift commander. The first shift, shift commander will complete the daily information <br />packet with information from the first shift and forward it at the end of the first shift to the <br />designated facility executive staff member. <br />Each facility will identify in its field memorandum the documents that comprise the daily <br />information packet, the executive staff members who review the information packet and the <br />method of distribution. <br />Following the administrative review, the signed shift summary will be forwarded to the <br />designated deputy warden (or second in command) for filing with the shift commander or <br />central control logs for that day. <br />7. Information Reports <br />Information reports (see SOP 105.02.01.001 General Reporting and Investigation of Major <br />Incidents) are used to (a) provide more detailed documentation of events that occur in a <br />correctional facility; and (b) document incidents and operational information to include, but <br />not limited to, incidents involving contractors, inmates, staff, vendors, visitors, and/or <br />volunteers; operational issues; and facility and/or maintenance problems .. <br />REFERENCES <br />Appendix A, Shift Commanders’ Daily Summary <br />Appendix B, Safety and Security Inspection Guidelines <br />Appendix C, Facility Administrative Inspection <br />Appendix D, Administrative Inspection Tracking Form <br />Standard Operating Procedure 105.02.01.001 Reporting and Investigation of Major <br />Incidents <br />Standard Operating Procedure 509.02.01.002, Key Control <br />– End of Document –